The Sydney Morning Herald logo
The Sydney Morning Herald logo
Advertisement

This was published 3 years ago

Another multibillion-dollar NSW train project at risk of delays, cost overruns

Matt O'Sullivan

The state’s purchase of new Spanish-built passenger trains is at serious risk of delays and cost overruns due to a dispute between the NSW government and a consortium responsible for the $2.8 billion project, internal documents reveal.

The dispute over “contentious design issues” comes as a separate fleet of Korean-built intercity trains is at the centre of a prolonged stoush between the government and rail unions, which has led to major disruptions for commuters.

Confidential board papers for a state-owned rail corporation reveal that the government has been embroiled in “claims and disputes” over the new regional trains with the private consortium led by Spanish manufacturer CAF, which built trams for Sydney’s inner west light-rail line, found to have cracks.

An artist’s impression of the new Spanish-built regional trains.NSW government

The papers show a deal days before Christmas failed to resolve the dispute between Transport for NSW and the consortium over whether parts of a revised design for the trains “constitute or involve modifications, and the time and cost impact of those alleged modifications”.

Advertisement

They warn that extra money from the government for the 29-train project will be needed if the financial hit to the state’s transport agency exceeds contingency funds.

Talks to resolve the dispute were planned to “determine liability and costs for modifications, including project delays”, the board papers show.

A committee for the Transport Asset Holding Entity, which now controls the state’s railways, also described the dispute as a “test case for the management of potential cost over-runs” on projects.

The interiors of the new regional trains.NSW government

The design problems are understood to relate mostly to passenger amenities on the new trains, including disabled access throughout the carriages.

Advertisement

Labor transport spokeswoman Jo Haylen said the government’s obsession with buying trains cheaply from overseas meant the people of NSW were stuck with more trains that were not up to standard, which could cost taxpayers extra.

“The government has already bought Spanish-built trams filled with cracks that have been out of service for nine months. Now it looks like they’ve made the same mistake again, with the same Spanish company,” she said.

An artist’s impression of the buffet facilities in the new regional trains.NSW government

Trams built by CAF had to be pulled from service on Sydney’s inner west light-rail line late last year for months after cracks were discovered in them.

Regional Transport and Roads Minister Sam Farraway said the new regional rail fleet had been “heavily impacted” by the pandemic, which stymied transport officials’ ability to meet face-to-face with the contactor and give guidance on the detailed design of the trains.

Advertisement

“Should Labor want to turn this into some tit-for-tat about using overseas contractors, then they should explain why the previous Labor government procured the Waratah trains from China,” he said of the trains, which have become the backbone of the suburban rail fleet.

Transport for NSW said it was “working closely” with the consortium to finalise the detailed design of the new regional trains, adding that the project remained within its budget.

However, the agency blamed the pandemic for impacting the delivery of the trains from Spain, citing hold-ups to “some aspects” of work used to guide the detailed design. It did not elaborate on the extent of any delay or the design issues with the trains.

The new trains will replace the state’s XPT, Xplorer and Endeavour trains, some of which are almost 40 years old and at the end of their working lives.

Advertisement

CAF and CIMIC, the parent company of consortium partner UGL, both declined to comment on the dispute over the $2.8 billion rail project.

Under the original plans, the first of the new trains were due to start entering service next year. The order comprises 117 new carriages, which will form 29 train sets of various lengths.

The project is separate to the state’s $2.88 billion intercity fleet, which has been dogged by a prolonged dispute between unions and the government over the safety of the trains.

The intercity train fleet, first slated to begin entering service in 2019, is sitting in storage on the NSW Central Coast, costing taxpayers $30 million a month.

The Morning Edition newsletter is our guide to the day’s most important and interesting stories, analysis and insights. Sign up here.

Matt O'SullivanMatt O'Sullivan is transport and infrastructure editor at The Sydney Morning Herald.Connect via X or email.

From our partners

Advertisement
Advertisement